Actualités en direct des projets (non traduites)
Nouvelles en VO
TN-Grid - Summer break
- Détails
Therefore, in a few days, the work generator will not be able to produce new tasks, only resends will be floating around.
I hope to be able to restart the system with a new project at the beginning of August.
Thank you all!
Source
Wanless Mersenne +2 - P2203:250000000 wu's (of 10000 trials each equiv.) processed!
- Détails
Source
PrimeGrid - GFN 19 Found!
- Détails
Source
PrimeGrid - GFN 20 Found! (Belated posting)
- Détails
Source
PrimeGrid - Math 2.0 Day Challenge starts July 8th
- Détails
Source
Milkyway@home - Server Maintenance 6/28/2023 12 PM EDT (4 PM UTC)
- Détails
I'll be shutting the server down for about an hour or two tomorrow at noon EDT (4 PM UTC) to take care of the loads of WUs stuck waiting for validation. They are from leftover Separation WUs trickling in after the project was shut off. Unfortunately I do not think that credit will be given out for these stuck WUs, as they were turned in after the project was shut down, and the validator is not running to give people credit.
N-body WUs will not be affected by this, and all credit will be assigned as per usual for N-body WUs.
Best,
Tom
Source
- World Community Grid - Upcoming System Outage July 25th
- NumberFields@home - Subfield 3 Officially Complete
- T.Brada Experiment Grid - We ask for help!
- Yoyo@home - P73 ECM factor!
- Wanless Mersenne +2 - 12-digit factor of P2203 has now been found by the project...
- Yafu - Aliquot sequence 837198 has terminated!!!